Changing a bathroom can bring in the building regulations through its drainage, the electrics near the bath or shower, its ventilation and the floor under a full bath. Below are the jobs that need approval, the special location for electrical work, the extractor fan and toilet rules, a checklist for a new bathroom, en suite or downstairs toilet, and who is responsible.
Do you need building regulations approval for a bathroom?
It depends on the room and the work. Refitting a bathroom with new units and fittings does not generally need building regulations approval, although drainage or electrical work in the refit may, the Planning Portal says. A bathroom in a room where there was not one before is likely to need approval for its ventilation, drainage, structural stability, electrical and fire safety, it says.
GOV.UK lists installing a bathroom that involves plumbing, and changing electrics near a bath or shower, among the alteration projects that need approval.
| Bathroom job | Building regulations approval | Source |
|---|---|---|
| Refitting a bathroom with new units and fittings | Not generally needed | Planning Portal |
| Drainage or electrical work in a refit | May be needed | Planning Portal |
| A bathroom in a room where there was not one before | Likely to be needed | Planning Portal |
| Installing a bathroom that involves plumbing | Needed | GOV.UK |
| A new circuit, such as one for a shower | Needed, unless self-certified | Planning Portal |
| An extra power or lighting point around a bath or shower | Needed, unless self-certified | Planning Portal |
| Altering the ground floor toilet in a home built after 1999 | May be needed | Planning Portal |
Notifiable electrical work in a bathroom
The Planning Portal lists three kinds of notifiable electrical work: a new consumer unit or fuse box; a complete new circuit, such as a new circuit for a shower; and alterations to existing circuits, such as an extra power point or lighting point, but only in special locations. In England, it says, special locations are the spaces around baths and showers.
The special location around a bath or shower
Regulation 12 of the Building Regulations 2010 defines a special location in two parts. The first is the space around a bath tap or shower head in a room containing a bath or shower, from the finished floor up to 2.25m, or to the shower head where it is fixed higher, and 0.6m out from the edge of the bath tub or shower tray, or 1.2m from the centre of the shower head where there is no tub or tray. The second is a room containing a swimming pool or sauna heater.
Who can self-certify bathroom electrics
An installer registered with a competent person scheme can self-certify that the work complies with the building regulations, the Planning Portal says, and it is best to use one. If the installer is not registered, a building control body or, in England only, an electrician registered with a third-party certification scheme has to inspect, approve and certificate the work, the Planning Portal says. Nottingham City Council says electrical work and gas installations need no approval provided a competent person carries them out.
Asking a bathroom fitter who certifies the electrics
Do this
Who will do the electrics, and which competent person scheme are they registered with? If they are not registered, who arranges the building control inspection?
Not this
You can do the electrics as well, can't you?
Bathroom extractor fan and ventilation rules
Any new bathroom, shower room or toilet should have a means of extract ventilation to reduce condensation and remove smells, the Planning Portal says. When you refurbish a bathroom, any existing extract ventilation has to be retained or replaced, it says, but where there was none, you need not add one. The Planning Portal gives a bathroom, with or without a WC, 4,000mm² equivalent area of background (trickle) ventilation.
Toilet building regulations and ground floor toilets
A toilet, unlike a bathroom, can have purge ventilation instead of extract ventilation where security is not an issue, the Planning Portal says, meaning an opening window or door on an external wall that meets Approved Document F. The opening has to be at least 1/20th of the room’s floor area for a window that opens more than 30 degrees, or 1/10th for one opening 15 to 30 degrees, and a window opening less than 15 degrees does not count. Check that the ventilation is in the price quoted for a new downstairs toilet.
Any home built after 1999 will have a ground floor toilet designed for visiting wheelchair users, the Planning Portal says. A refit should not remove that toilet or make it any less accessible, and a building regulations application may be required to alter it.
Timber floors and the weight of a full bath
A new bathroom suite on a floor of timber joists and boards carries a significant risk of the bath overloading the floor once it is full of water and in use, the Planning Portal says. Where a room’s use changes and the load on the floor could change significantly, strengthening may be necessary. A structural engineer or surveyor can assess the floor and produce the paperwork a building control body will require before the work starts.
Planning permission and listed buildings
Building regulations approval is different from planning permission, and you might need both, GOV.UK says. A planning application for installing a bathroom is generally not required unless it is part of a house extension, the Planning Portal says, though in a listed building you should consult the local planning authority.
Nottingham City Council says most building work to a listed building, internal and external, needs listed building consent, and its My Property tool shows whether a property is listed.
Checklist for a new bathroom, en suite or downstairs toilet
Nottingham City Council says the building regulations will probably apply to fittings including washing and sanitary facilities, hot water cylinders, and foul water and rainwater drainage.
Before work starts on a new bathroom, en suite or downstairs toilet
- Extract ventilation, or for a toilet only, an opening window or door on an external wall
- Electrics by a registered competent person, or inspected by building control or a third-party certifier
- A timber joist floor under a new bath assessed by a structural engineer or surveyor
- Whether the new drainage needs approval, and who applies for it
- In a home built after 1999, the ground floor toilet kept and no less accessible
- Listed building consent, if the home is listed
Who is responsible for building regulations approval
If you are employing a builder, the responsibility will usually be theirs, but you must confirm this at the very beginning, Nottingham City Council says. If you are the owner and the work does not follow the regulations, it is you who will be served with an enforcement notice.
GOV.UK says the person doing the work could be prosecuted and fined if they do not comply with the building regulations, and that without approval you will not have the certificates of compliance you may need when you sell your home.
Do not let the work start before you know who is getting approval
If nobody gets approval and the work does not follow the regulations, the enforcement notice comes to you as the owner, and you will not have the certificates of compliance you may need when you sell.
Among the ten Nottingham bathroom fitters we compare, Goldswan Bathrooms in Arnold says its own team does the plumbing, electrics, tiling, plastering and flooring, with one project manager as the point of contact. Whoever you hire, make who applies for approval one of the questions to ask a bathroom fitter before you accept a quote.
Common questions
Do you need building regulations approval for a new bathroom?
A bathroom in a room where there was not one before is likely to need approval, the Planning Portal says. Refitting an existing bathroom with new units and fittings does not generally need it, although drainage or electrical work in the refit may.
What are the building regulations for a toilet?
Any new toilet should have extract ventilation, or an opening window or door on an external wall where security is not an issue. In a home built after 1999, the ground floor toilet should not be removed or made less accessible, and altering it may need a building regulations application.
Is an extractor fan a legal requirement in a bathroom?
A new bathroom or shower room should have a means of extract ventilation, such as an extractor fan. On a refurbishment, any existing extract ventilation has to be kept or replaced, but where there was none you need not add one.
Does fitting an electric shower need building regulations approval?
It does if the job includes a new circuit for the shower, or any addition or alteration to existing circuits in the space around the bath or shower, since both are notifiable. A registered competent person can self-certify that work; otherwise building control or, in England, a registered third-party certifier has to approve it.
Do you need planning permission for a new bathroom?
Not generally, unless the bathroom is part of a house extension, the Planning Portal says. A listed building is different, since Nottingham City Council says most building work to one, internal or external, needs listed building consent.
Who is responsible for building regulations, me or the bathroom fitter?
Usually the builder's, if you employ one, Nottingham City Council says, but you must confirm this at the very beginning. If the work does not follow the regulations, the owner is the one served with an enforcement notice.
Where the figures come from
- Planning Portal, is building regulations approval needed for work to a kitchen or bathroom read 2026-09-17
- GOV.UK, building regulations approval read 2026-09-17
- Planning Portal, electrics and building regulations read 2026-09-16
- The Building Regulations 2010, regulation 12 read 2026-09-17
- Nottingham City Council, registered tradespeople and competent person schemes read 2026-09-17
- Planning Portal, the need for additional ventilation in a kitchen or bathroom read 2026-09-17
- Planning Portal, accessibility of ground floor toilets read 2026-09-17
- Planning Portal, suitability of existing floor structures read 2026-09-17
- Planning Portal, kitchens and bathrooms read 2026-09-17
- Nottingham City Council, conservation areas and listed buildings read 2026-09-17
- Nottingham City Council, check the approval you need for building work read 2026-09-17
Next
The Best Bathroom Fitters in Nottingham
Ten firms, ranked on trade memberships, written guarantees and years in the trade.